After a detailed analysis of the building in the ITE that you have hired, it may be that it needs a rehabilitation project to bring it up to date and rehabilitate it (for example, to ensure that it does not use any energy like buildings NZEB , or simply adapt it to new requirements (if we want to add two more plants or make a large pool)
The basic and execution project are the documents that define the CTE in part I as necessary for the execution of building works.
BASIC PROJECT
- Urban justification. Example of a construction definition plane. Details in section. [/ Caption]
- Instructions for use and maintenance.
- Quality control plan. For example, in the specific case of insulation: both documentary and on-site insulation checks will be prescribed, which will consist of: checking the manufacturer’s technical data sheet – checking material conductivities, densities, etc. – Check the CE marking, and most importantly carry out random thickness control tests, in this way it can be prescribed that the insulation facing is punctured every 10 m2 with a needle to verify that the thickness is not less than 20 cm in diameter. depth)
- Measurements by items and work unit. (Each work item will be described qualitatively and valued quantitatively; for example
- Energy certificate.
All of these documents can be part of a project. If you do not want to get surprises in a work, what you have to invest the most in is the project. The project allows: Controlling the quality of what is built, controlling the budget and above all, that what you build, your investment, is within the regulations. Consult us or ask for a quote at KAITEK ARCHITECTURE without any commitment.