Complete house renovations services in Barcelona require detailed planning to ensure an efficient process and optimal results. Whether updating an old apartment or improving the layout of a home, following a structured order during the project is key to avoiding delays and unforeseen problems.
In this article, we explain the main stages of a complete home renovation and what aspects you should consider during each phase.
1. Project Planning and Design
Before starting any comprehensive renovation in Barcelona, it is essential to define the project’s objectives. This phase includes:
- Analysis of the home’s current condition.
- Analysis of the owner’s needs and preferences.
- Development of the design and layout of the space.
- Selection of materials and finishes.
- Detailed estimate for the project.
Having a professional team at this stage facilitates decision-making and avoids cost overruns during execution.
2. Obtaining Licenses and Permits
Depending on the type of renovation, you may need specific permits before starting work. In Barcelona, some of the most common procedures are:
- Minor Works Permit: For renovations without structural changes.
- Major Works Permit: If structural elements or façades are modified.
- Prior Notice: In some cases, for minor renovations.
Properly managing these documents avoids penalties and delays in the process.
3. Demolition and Debris Removal
Once the permits have been obtained, the demolition phase begins. During this stage, partitions, floors, woodwork, and other elements to be renovated are removed. It is crucial to carry out this work in a safe and planned manner to avoid damage to the structure and ensure proper debris removal.
4. Installations and Structure
Once the space is cleared, key systems in the home are installed:
- Plumbing and drainage: Renewing pipes and drains.
- Electricity and lighting: Changing or updating the electrical system.
- HVAC and heating: Installing air conditioning, heating, or energy-efficient systems.
- Structural reinforcements: If the renovation includes changes to load-bearing walls or floors.
It is essential to coordinate the different trades well to avoid interference between projects.
5. Masonry and Cladding
Once the installations are completed, the masonry phase begins, where new partitions are erected, false ceilings are built, and flooring and cladding are installed. This is when the home begins to take shape and the aesthetic finishes are defined.
6. Carpentry, Painting, and Final Finishes
In this stage, doors, windows, cabinets, and other carpentry elements are installed, along with paint and finishing touches. This is the time for the details, ensuring that each space looks exactly as planned.
7. Cleaning and Handover of the Home
Once the work is completed, a deep cleaning is performed to remove dust and debris. The renovation team reviews every detail before final handover, ensuring everything is in perfect condition.
Carrying out a comprehensive renovation in Barcelona requires organization, coordination, and good planning. Following these phases allows for the optimization of the process and ensures that the result is functional, aesthetic, and of high quality. If you’re thinking about renovating your home, Kaitek Arquitectura will ensure an efficient, hassle-free project.